Wall tiling in Cheltenham
Wall tiling in Cheltenham for bathrooms, shower areas and kitchen splashbacks. We plan where every cut falls before the first tile goes up, so the joints line up with windows, niches and taps rather than fighting them.


What our wall tiling covers
- 01
Bathroom walls
Full height or half height, around baths, basins and boxing in.
- 02
Shower areas
Enclosures and walk-in showers, with the wet zone prepared before tiling.
- 03
Kitchen splashbacks
Between worktop and wall units, behind hobs and around sockets.
- 04
Niches and reveals
Shower niches, window reveals and returns finished with neat trims or mitred edges.
- 05
Feature walls
Vertical stack, herringbone and brick bond layouts in ceramic, porcelain or stone.
- 06
Mosaics and handmade tiles
Sheets and irregular handmade tiles that need a patient eye on the joints.

Splashbacks planned around the kitchen
A splashback is short, so every cut shows. We centre the pattern on the hob or the window and run the joints to finish cleanly under the wall units.
Sockets and switches are cut round neatly, and we leave a silicone joint where the tiles meet the worktop so the two can move independently.
When you might need it
- You are refitting a bathroom or shower room and want the tiling done properly.
- A new kitchen is going in and the splashback needs tiling once the worktops are fitted.
- The existing wall tiles are cracked, hollow or dated and it is time to start again.
From setting out
to the final clean.
- 1
Set out
We find the centre lines and plan the cuts so there are no thin slivers at corners, ceilings or window reveals.
- 2
Prepare
We check the wall is sound, flat and suitable for the tile weight, and talk through what preparation it needs.
- 3
Fit
Tiles are fixed with an adhesive suited to the tile and the wall, with trims or mitres on every exposed edge.
- 4
Finish
Grout, silicone at the internal corners and the bath or tray, then a final clean.
Wall tiling questions
General guidance from the kind of questions people ask before a job. Every room is different, so we confirm the details on the visit.
Can you tile over the existing tiles?
Sometimes. As general guidance, it can work on a dry wall where the old tiles are firmly bonded and the wall can carry the extra weight. In showers and wet areas we normally recommend taking the old tiles off so the surface underneath can be checked and prepared.
Do shower walls need waterproofing before tiling?
As general guidance, yes. Tiles and grout are not waterproof on their own, so wet areas are usually tanked with a waterproofing system or built from boards designed for wet rooms. We will look at what is there and explain the options for your shower.
How soon can we use the shower?
It depends on the adhesive, grout and silicone used. Each product has its own curing time, often a day or more, and we will tell you exactly when the shower is ready before we leave.
Do you supply the tiles?
Either way works. You can choose your own and we will confirm the quantity, including spares for cuts and future repairs, or we can advise on tiles that suit the room and the layout.
Related services and work
Good tiling starts
with your plans.
A bathroom wall, a shower or a splashback: share the outline and we’ll discuss the work.
Areas we cover: CheltenhamGloucesterTewkesburyWinchcombe


